Log in
Your location... home : about us : 2004 meeting schedule
 

  •   What do we do?

  •  
  •   Objectives and benefits

  •  
  •   Who can join?

  •  
  •   Current members

  •  
  •   How to get involved as a supplier

  •  
  •   The 2009 programme

  •  
  •   The DEA format

  •  
  •   Guidelines for presenters

  •  
  •   Contact the DEA

  •  
  •   Back to home

  •  

    Previous meetings

    Date
    Meeting Topic
    Host
    Location
    03/12/2009 Expandables, multilaterals and associated technologies To be confirmed Tbc
    17/09/2009 ERD and associated technology Halliburton Stavanger
    04/06/2009 Well construction fluids Addax Geneva
    12/03/2009 Drilling efficiency, resourcing and competency Baker Hughes Bergen
    04/12/2008 Mature Fields - Prolonging Profitability Talisman Aberdeen
    11/09/2008 Deepwater Operations NOV Kristiansand
    05/06/2008 Long Term Well Integrity Chevron Aberdeen
    13/03/2008 Drilling Efficiency Weatherford London
    06/12/2007 HPHT critical and associated technologies Chevron Aberdeen
    13/09/2007 Managed Pressure Drilling / Dual gradient drilling / Deepwater Operations Hydro Norway
    14/06/2007 Low cost reservoir access Statoil Harstad
    15/03/2007 How can we drill wells more efficiently DONG Copenhagen
    07/12/2006 Wellbore stability, kicks and losses (with mud weight window) / Realtime formation pressure & ECD control BG Reading, UK
    07/09/2006 Development in innovative well design / slim well design / CwD / intervention / completion Eni Milan, Italy
    15/06/2006 Real time enablement of Drilling Decisions Schlumberger Cambridge, UK
    23/03/2006 Drilling Education, Knowledge Transfer and competency assessment / Eastern block technology transfer Odfjell Drilling Bergen, Norway
    01/12/2005 Underbalanced and near balance drilling Halliburton Bucharest
    29/09/2005 Directional drilling tools / systems (RSS, motors, hydraulic, electrical, surveying) BP Wytch Farm Dorset
    23/06/2005 Muds / Cuttings disposal / Recent developments in drilling muds ConocoPhillips Tananger
    10/03/2005 Annular isolation (cement, swelling rubber, mud solidification etc.) Total Pau
    02/12/2004 Well Placement - General / ERD Baker Hughes Inteq Celle
    09/09/2004 HPHT / Rotating Head / mud wt windows Varco Drilling Equipment Aberdeen
    03/06/2004 Casing drilling / through tubing drilling OMV Vienna
    25/03/2004 Learning & knowledge management / Reducing NPT Burlington Resources London
    11/12/2003 Low cost wells Shell Aberdeen
    11/09/2003 Operation centres Statoil Stavanger
    12/06/2003 Rig floor automation DONG Copenhagen
    13/03/2003 Wellbore stability Schlumberger Paris
    05/12/2002 The drilling / G&G (Geology & Geophysics) interface - best practice forum BP London
    19/09/2002 Hydraulics, hole cleaning & cementing Halliburton Celle
    13/06/2002 HP / HT Wells Norsk Hydro Bergen
    21/03/2002 Expandable tubular experiences & lessons learnt Schlumberger Geneva
    29/11/2001 Extended reach drilling Enterprise Oil Dublin
    06/09/2001 Lower cost wells Schlumberger Aberdeen
    14/06/2001 Underbalanced drilling TotalFinaElf Pau
    29/03/2001 Deepwater Operations IFP Paris
    30/11/2000 R&D Requirements for 2005 Shell Rijswijk
    14/09/2000 Performance Enhancement & Measurement Phillips Stavanger
    15/06/2000 Well Planning Process for lower cost wells ENI Agip Milan
    23/03/2000 ERD & Multilateral Wells Chevron Aberdeen
    11/11/1999 Deepwater Operations Statoil Stavanger
    09/09/1999 Extended Reach Wells Enterprise London
    10/06/1999 Learning & Knowledge Management Maersk Copenhagen
    25/03/1999 Low Cost Wells OMV Vienna

    If you would like to view a complete list of upcoming meetings click here

    If you have any questions regarding this website or the DEA or if you would like to attend one of the above meetings please contact us

    Any questions about the site or the DEA can be sent to : shreekant.mehta@otmnet.com
    Please have a look at our other networks: PEA, FEA